Home » News & Updates » Isolation Rooms - Engineering and Design Requirements
Date published 01/02/2017

A new AusHFG resource has been  developed entitled Isolation Rooms - Engineering and Design Requirements (Revision 1). This document has been developed to:

  •  provide an up-to-date resource to projects as it is anticipated that HB260 Hospital Acquired Infections - Engineering Down the Risk (2003) will be retired in the near future
  •  incorporate the lessons learned from recent projects.

The information has been developed with the input of a an expert group of health service and industry representatives. A thank you is extended to all those who have contributed to the development of this document.