Home » Content » Project Resources - Clinical

A new AusHFG resource has been  developed entitled Isolation Rooms - Engineering and Design Requirements (Revision 1). This document has been developed to:

  •  provide an up-to-date resource to projects as it is anticipated that HB260 Hospital Acquired Infections - Engineering Down the Risk (2003) will be retired in the near future
  •  incorporate the lessons learned from recent projects.

The information has been developed with the input of a an expert group of health service and industry representatives. A thank you is extended to all those who have contributed to the development of this document.

Downloads
Isolation Room- Engineering and Design Requirements
Archive

This sheet is a companion document to the AusHFG HPUs for Operating Unit, ICU and ED. It sets out a terminology that can be used to describe typical pendant configuration and digital integration in operating rooms (DOR), based on contemporary equipment supply streams.

Downloads
AusHFG Terminology for Pendants and DOR
Archive